It is divided into three parts: 25 °brine sub washing tank, 13 ° brine sub washing tank and clear water sub washing tank. The shredded materials enter the 25 °salt water washing tank for washing. The material is guaranteed to flow evenly in the pool through the material transfer drum in the pool. The floating water material is sent to the dehydrator through the screw for dehydration treatment and then sent to the 13 ° brine washing tank. The floating water material is sent out through the screw for dehydration and bagging. After dehydration,the submerged material enters the clear water separation sedimentation tank for density separation.The submerged material and floating material in the clear water tank are separated and then enter the subsequent dehydrator for dehydration and then output for bagging.
1. The materials in contact with water are all high-quality stainless steel.
2. The length of pool is 8000mm, the width is 1300mm, and the height of water surface is 1600mm.
3. The floating and sinking materials are pushed by screw, which makes the discharging more efficient, less maintenance and high efficiency.